Amped Up
Energy
We are consistently trusted for significant energy projects, including Otay Mesa Power Plant, the largest air-cooled power plant in the state of California. In this location, we installed two 170 MW GE natural gas combustion turbine generators, each with their own heat recovery system, a single Westinghouse 180 MW steam turbine generator and 110 separate systems that support the turbine generator combinations. We also installed all distribution systems from 18kV to 120V, including over 1,155,000 feet of cable with over 40,000 terminations.
Project Types:
- Photovoltaic (PV)
- Cogeneration
- Microgrids
- Battery Storage
- Electric Vehicle Charging Stations (EVCS)
- Hydrogen Plants
Related Projects
Genentech gRide Bus Chargers
The Genentech B59 gRide lot is North America's largest electric bus charging depot, featuring EV chargers, new 4000A services, walkways, lighting, bioretention areas, and a monarch butterfly habitat.
General Contractor
Market Sector
- Energy
- Electric Vehicle Charging Stations (EVCS)
Balance of Plant (BOP) San Diego Gas & Electric Microgrid
Four microgrids at SDG&E substations used Mitsubishi storage to provide islanding power and support CAISO during normal ops as part of the OIR Track 4 project.
Market Sector
- Energy
- Microgrids
Fluence - AES Los Alamitos 100MW BESS Facility
The Fluence/AES Los Alamitos 100MW BESS stores energy for fast delivery during peak demand, supporting grid reliability and clean energy with up to 400MWh of storage.
General Contractor
Market Sector
- Energy
- Battery Storage